A project team assesses their primary risk factor's probability of failure with a maturity risk of 0.3, a complexity risk of 0.7, and a dependency risk of 0.8. The probability of failure is: a. Greater than 0.3 but less than or equal to 0.55.
b. Greater than or equal to 0.9.
c. Greater than 0.56 but less than or equal to 0.89.
d. Less than or equal to 0.3.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
What is the probability of drawing three queens from a standard deck of cards, given that the first card drawn was a queen? assume that the cards are not replaced.
Answers: 2
question
Mathematics, 21.06.2019 17:00
Issof claims that the scale factor is 1/2. which statement about his claim is correct
Answers: 3
question
Mathematics, 21.06.2019 18:40
(mc 02.03) what set of reflections and rotations would carry rectangle abcd onto itself? reflect over the y-axis, reflect over the x-axis, rotate 180° rotate 180°, reflect over the x-axis, reflect over the line y=x reflect over the x-axis, rotate 180°, reflect over the x-axis rotate 180, reflect over the y-axis, reflect over the line y=x
Answers: 1
question
Mathematics, 21.06.2019 19:00
The probability that you roll a two on a six-sided die is 1 6 16 . if you roll the die 60 times, how many twos can you expect to roll
Answers: 1
You know the right answer?
A project team assesses their primary risk factor's probability of failure with a maturity risk of 0...
Questions
question
Mathematics, 14.01.2021 05:40
question
Mathematics, 14.01.2021 05:40
Questions on the website: 13722363