subject
Mathematics, 07.06.2020 06:00 jalalblal

Lockheed Martin, the defense contractor designs and build communication satellite systems to be used by the U. S. military. Because of the very high cost the company performs numerous test on every component. These test tend to extend the component assembly time. Suppose the time required to construct and test (called build time) a particular component is thought to be normally distributed, with a mean equal to 60 hours and a standard deviation equal to 9.4 hours. To keep the assembly flow moving on schedule, this component needs to have a build time between 52 and 70 hours. Find the probability that the build time will be such that assembly will stay on schedule.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which multiplicative property is being illustrated below? (type commutative, associative, or identity) 5 × 2 × 4 = 2 × 5 × 4
Answers: 1
question
Mathematics, 21.06.2019 19:30
The amount spent on food and drink by 20 customers is shown below what is the modal amount spent ?
Answers: 1
question
Mathematics, 21.06.2019 21:30
About 9% of th population is hopelessly romantic. if 2 people are randomly selected from the population, what is the probability that at least 1 person is hopelessly romantic?
Answers: 1
question
Mathematics, 22.06.2019 02:30
What is the output, or dependent variable of quantity? 1: x 2: f(x) 3: y
Answers: 1
You know the right answer?
Lockheed Martin, the defense contractor designs and build communication satellite systems to be used...
Questions
Questions on the website: 13722360