subject
Mathematics, 08.06.2020 10:57 dtrdtrdtrdtrdrt1325

On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufacture a pair of running shoes. How often will it take the factory more than 27 minutes to manufacture a pair of running shoes? Note: Assume that a Normal model is appropriate for the distribution of manufacturing times.
A.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 47.5% of the time.

B.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 2.5% of the time.

C.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 95% of the time.

D.
It takes the factory more than 27 minutes to manufacture a pair of running shoes about 5% of the time.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
In δabc, if the length of side b is 3 centimeters and the measures of ∠b and ∠c are 45° and 60°, respectively, what is the length of side c to two decimal places?
Answers: 1
question
Mathematics, 21.06.2019 21:00
Sue's average score for three bowling games was 162. in the second game, sue scored 10 less than in the first game. in the third game, she scored 13 less than in the second game. what was her score in the first game?
Answers: 2
question
Mathematics, 21.06.2019 21:10
Consider circle o, where and . m∠bpd °. °.
Answers: 3
question
Mathematics, 21.06.2019 23:30
Ahighway between points a and b has been closed for repairs. an alternative route between there two locations is to travel between a and c and then from c to b what is the value of y and what is the total distance from a to c to b?
Answers: 1
You know the right answer?
On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufactu...
Questions
question
Mathematics, 17.02.2022 19:00
question
Mathematics, 17.02.2022 19:00
question
Mathematics, 17.02.2022 19:00
Questions on the website: 13722363