subject
Mathematics, 14.06.2020 05:57 meliac

One division of a large defense contractor manufactures telecommunication equipment for the military. This division reports that 12% of non-electrical components are reworked. Management wants to determine if this percentage is the same as the percentage rework for the company’s electrical components. The Quality Control Department plans to check a random sample of the over 10,000 electrical components manufactured across all divisions. The 95% confidence interval based on this data is .0758 to .1339. Should management conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Compare these two waves: the blue and orange waves have the same pitch, but the blue wave is louder. the blue and orange waves have the same volume, but the blue wave has a higher pitch. the orange wave has a higher pitch, but the blue wave is louder. the blue wave has a higher pitch, but the orange wave is louder.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Which values of p and q result in an equation with exactly one solution? px-43=-42x+q choose all answers that apply: a) p=-43 and q=-43 b) p=42 and q=43 c) p=43 and q=−42 d) p=42 and q=42
Answers: 1
question
Mathematics, 21.06.2019 20:50
Type the correct answer in each box, round your answers to the nearest integer 20 25 30 in the figure, the perimeter of hexagon abcdef is approximately w units, and its area is square units
Answers: 3
question
Mathematics, 21.06.2019 21:50
Which value of y will make the inequality y< -1 false?
Answers: 2
You know the right answer?
One division of a large defense contractor manufactures telecommunication equipment for the military...
Questions
question
Mathematics, 30.10.2020 21:20
question
Mathematics, 30.10.2020 21:20
question
History, 30.10.2020 21:20
question
Social Studies, 30.10.2020 21:20
Questions on the website: 13722360