Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C averages 40 picks per hour. [20 points] a. If the 3 workers work in a bucket brigade, in which order the workers should be arranged?
b. If the average order requires 100 picks, what would be the average rate of order completion of the team under bucket brigades?
c. Assume the 3 workers are assigned into zones with equal work in each. What is the average rate of order completion of the team when the workers are arranged in A à B à C order?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
The solution set for 5v2 – 125 = 0 is
Answers: 1
question
Mathematics, 21.06.2019 19:30
It is saturday morning and jeremy has discovered he has a leak coming from the water heater in his attic. since plumbers charge extra to come out on the weekends, jeremy is planning to use buckets to catch the dripping water. he places a bucket under the drip and steps outside to walk the dog. in half an hour the bucket is 1/5 of the way full. what is the rate at which the water is leaking per hour?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Credit card a offers an introductory apr of 3.4% for the first three months and standard apr of 15.7% thereafter,
Answers: 3
question
Mathematics, 21.06.2019 21:30
For the inequality |c| < |d| to be true, which of the following must be true?
Answers: 2
You know the right answer?
Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C aver...
Questions
question
Mathematics, 22.09.2021 17:20
question
Mathematics, 22.09.2021 17:20
question
Social Studies, 22.09.2021 17:20
question
Mathematics, 22.09.2021 17:20
question
Mathematics, 22.09.2021 17:20
question
Mathematics, 22.09.2021 17:20
Questions on the website: 13722361