The average number of days required by a college’s undergraduate students to complete a project was 22 days in the previous year. The college administration wishes to determine whether the average differs this year. A sample of 20 students produced a sample mean of 20 days this year, with a sample standard deviation of 6 days. Assume that the number of days to complete the project is normally distributed. Is there enough evidence at the 5% significance level to determine whether the mean has increased? a. No, because the test statistic falls outside the rejection region [1.645, [infinity]).
b. Yes, because the test statistic falls in the rejection region (-[infinity],-1.96].
c. No, because the test statistic falls outside the rejection region [1.960, [infinity]).
d. No, because the test statistic falls outside the rejection region [1.729, [infinity]).
e. None of the above

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
What is the area of a pizza with a radius of 40 cm leave the answer in terms of π to find your exact answer 40π cm² 1600π cm² 800π cm² 80π cm² π=pi
Answers: 1
question
Mathematics, 21.06.2019 17:00
Use the expression below.–4b + 8c + 12 – 8b – 2c + 6part asimplify the expression. enter your answers in the boxes. b + c + part bfactor the simplified expression using the gcf. a. 2(–2b + c + 3) b. 3(–2b + c + 3) c. 4(–2b + c + 3) d. 6(–2b + c + 3)part cwhat is the value of the expression when b = 2 and c = –3? enter your answer in the box.
Answers: 1
question
Mathematics, 22.06.2019 01:30
Three students each examine the system of linear equations shown. 8x + 4y = 16 8x + 2y = 8 caleb says there is exactly one solution. jeremy says there is no solution. kim says there are infinitely many solutions. which student is correct? provide mathematical reasoning to support your answer. answer in complete sentences. : d
Answers: 1
question
Mathematics, 22.06.2019 05:30
How do you solve questions 29 and 31?
Answers: 1
You know the right answer?
The average number of days required by a college’s undergraduate students to complete a project was...
Questions
question
Mathematics, 06.07.2019 17:30
question
History, 06.07.2019 17:30
question
History, 06.07.2019 17:30
Questions on the website: 13722359