A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston, MA for 150 million dollars. A similar treatment plant with is planned for construction in 2025 in Springfield, MA. The new plant will have a capacity of 30 mgd. Determine the following:A) The estimated cost of the new treatment plant in 1990 dollars. Use Cost Capacity Factor Method and assume p = .75. Assume city-cost indices are: Boston = 115, Springfield = 102. (5) B) The estimated cost of the new treatment plant in 2025 dollars. According to the 2025 projected cost index = 235.6 and the historical cost index for 1990 was 94.3.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
20 da is equal to a. 2,000 cm. b. 2 m. c. 20,000 cm. d. 20,000 mm
Answers: 1
question
Mathematics, 21.06.2019 17:00
What is a graph with a never ending line called?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Identify the type of observational study described. a statistical analyst obtains data about ankle injuries by examining a hospital's records from the past 3 years. cross-sectional retrospective prospective
Answers: 2
question
Mathematics, 21.06.2019 19:30
Write an equation for the function that includes the points (2,100)and (3,100)
Answers: 2
You know the right answer?
A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston,...