subject
Mathematics, 24.06.2020 08:01 yclark98563p5z2gt

A construction worker pulls a five-meter plank up the side of a building under construction by means of a rope tied to one end of the plank (see figure). Assume the opposite end of the plank follows a path perpendicular to the wall of the building and the worker pulls the rope at a rate of 0.19 meter per second. How fast is the end of the plank sliding along the ground when it is 2.3 meters from the wall of the building? (Round your answer to two decimal places.) ? m/sec

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Which math sentence can be used to determine if the triangle is a right triangle?
Answers: 1
question
Mathematics, 22.06.2019 00:30
What is the value of the discrimination for the quadratic equation 0=×2+2+×2
Answers: 2
question
Mathematics, 22.06.2019 01:20
Aprobability experiment is conducted in which the sample space of the experiment is s={7,8,9,10,11,12,13,14,15,16,17,18}, event f={7,8,9,10,11,12}, and event g={11,12,13,14}. assume that each outcome is equally likely. list the outcomes in f or g. find p(f or g) by counting the number of outcomes in f or g. determine p(f or g) using the general addition rule.
Answers: 2
question
Mathematics, 22.06.2019 02:20
What are the solutions of the equation x4 – 5x2 – 14 = 0? use factoring to solve. someone !
Answers: 2
You know the right answer?
A construction worker pulls a five-meter plank up the side of a building under construction by means...
Questions
question
Mathematics, 15.02.2021 14:00
question
English, 15.02.2021 14:00
question
History, 15.02.2021 14:00
question
Mathematics, 15.02.2021 14:00
Questions on the website: 13722366