subject
Mathematics, 18.07.2020 04:01 mahaleyrenee1195

An oil exploration company currently has two active projects, one in Asia and the other in Europe. Let A be the event that the Asian project is successful and B be the event that the European project is successful. Suppose that A and B are independent events with P(A) = 0.8 and P(B) = 0.4. Given that at least one of the two projects is successful, what is the probability that only the Asian project is successful?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
What fraction is equivalent to 0.46464646··· a. 46⁄99 b. 46⁄999 c. 46⁄100 d. 23⁄50
Answers: 1
question
Mathematics, 21.06.2019 23:00
72 the length of a side of a triangle is 36. a line parallel to that side divides the triangle into two parts of equal area. find the length of the segment determined by the points of intersection between the line and the other two sides of the triangle.
Answers: 1
question
Mathematics, 21.06.2019 23:20
The graph of y=x3 is transformed as shown in the graph below. which equation represents the transformed function?
Answers: 1
question
Mathematics, 22.06.2019 01:30
How do u write a function for the reflection across the y axis
Answers: 1
You know the right answer?
An oil exploration company currently has two active projects, one in Asia and the other in Europe. L...
Questions
Questions on the website: 13722367