Construction crews A, B,C and D build a 1200 meter long road. Team A builds 1/2 of the total length built by the other 3 teams. Team B builds 1/3 of the total length built by the other 3 teams. C builds a section that is 1/4 of the length built by the other teams. How many meters did Team D build

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Which answer is the solution set to the inequality |x|< 9? a. x< -9 or x> 9 b. x> -9 and x< 9 c. x> -9 or x< 9 d. x< 9 and x< 9
Answers: 1
question
Mathematics, 21.06.2019 19:30
If you could answer these your a life saver
Answers: 2
question
Mathematics, 21.06.2019 22:00
What is the graph of the function fx x+2/x-3?
Answers: 3
question
Mathematics, 22.06.2019 00:20
❤️ (geometry) does the construction demonstrate how to copy an angle correctly using technology a) yes; the distance between points a and f was used to create circle h b) yes; the distance between points f and g was used to create circle h c)no; the distance between points a and f was used to create circle h d) no; the distance between points f and g was used to create circle h
Answers: 2
You know the right answer?
Construction crews A, B,C and D build a 1200 meter long road. Team A builds 1/2 of the total length...
Questions
question
Biology, 28.10.2019 16:31
question
Mathematics, 28.10.2019 16:31
Questions on the website: 13722367