Mathematics, 02.09.2020 01:01 TheaMusic524
The manager of a factory collected data in order to analyze the relationship
between the number of hours of training a worker receives and
the worker's error rate. The line of best fit for the collected data is y = 0.1 -0.005x, where x is the number of hours of training a worker
receives and y is the error rate.
What approximate error rate should the manager expect for a worker who receives 6 hours of training?
O A. 0.01
OB. 0.07
OC. 0.13
OD. 0.17
Answers: 2
Mathematics, 21.06.2019 20:00
Aconstruction worker has rope 9 m long he needs to cut it in pieces that are each 3 /5 m long how many such pieces can he cut without having any rope leftover?
Answers: 3
Mathematics, 21.06.2019 21:00
These box plots show the number of electoral votes one by democratic and republican presidential candidates for the elections from 1984 through 2012. which statement best compares the spread of the data sets
Answers: 2
Mathematics, 21.06.2019 22:00
If my mom gets $13.05 an hour, and she works from 3: 30 to 10: 45 in the morning, how much money does my mom make?
Answers: 1
Mathematics, 21.06.2019 23:00
Which rectangle if translated 6 units right and 16 units down and the rotated 90° clockwise about the point (4, -11) will result in rectangle e?
Answers: 2
The manager of a factory collected data in order to analyze the relationship
between the number of...
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Physics, 12.09.2020 01:01
Biology, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
History, 12.09.2020 01:01
English, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Biology, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01
Mathematics, 12.09.2020 01:01