subject
Mathematics, 20.09.2020 08:01 jujusmith2022

During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of bentonite to be mixed with 198 lb of concrete mixed every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 3
question
Mathematics, 21.06.2019 18:00
You paid 28.00 for 8 gallons of gasoline. how much would you pay for 15 gallons of gasoline?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Asmall business produces and sells balls. the fixed costs are $20 and each ball costs $4.32 to produce. each ball sells for $8.32. write the equations for the total cost, c, and the revenue, r, then use the graphing method to determine how many balls must be sold to break even.
Answers: 1
question
Mathematics, 21.06.2019 23:30
Solve the equation.then check your solution 8=1.88+a
Answers: 2
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
Questions
question
History, 15.12.2021 05:10
question
Biology, 15.12.2021 05:10
question
English, 15.12.2021 05:10
Questions on the website: 13722367