subject
Mathematics, 22.09.2020 22:01 candycrush24

A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. Each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 millers. Assume that each machine operates a maximum of 4500 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Which expression is equivalent to (9x - 3 1/ + 1 3/8)
Answers: 1
question
Mathematics, 21.06.2019 17:00
In triangle opq right angled at p op=7cm,oq-pq=1 determine the values of sinq and cosq
Answers: 1
question
Mathematics, 21.06.2019 21:30
Hannah paid $3.20 for 16 ounces of potato chips. hank paid $3.23 for 17 ounces of potato chips. who paid less per ounces?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
question
Chemistry, 26.08.2019 20:50
question
Computers and Technology, 26.08.2019 20:50
Questions on the website: 13722367