subject
Mathematics, 05.10.2020 16:01 Spongebone4571

A construction crew is lengthening a road that originally measured 41 miles. The crew is adding one mile to the road each day. The length, L (in miles), after d days of construction is given by the following.
L = 41+d
What is the length of the road after 28 days?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Simplify a7/a4 a) 1/a3 b)-a/a2 c)a4/a3 d)a3
Answers: 2
question
Mathematics, 21.06.2019 17:00
27 is what percent of 108? 27 is % of 108
Answers: 2
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! the boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a. e = 2b - 212 b. b = 2e - 212 c. e = -2b + 212 d. b = -2e + 212
Answers: 1
question
Mathematics, 21.06.2019 20:30
Find the quotient with the restriction.
Answers: 1
You know the right answer?
A construction crew is lengthening a road that originally measured 41 miles. The crew is adding one...
Questions
question
Mathematics, 24.11.2021 04:10
question
Mathematics, 24.11.2021 04:20
question
Chemistry, 24.11.2021 04:20
Questions on the website: 13722359