subject
Mathematics, 11.10.2020 23:01 rakanmadi87

Each day for two workweeks (10 days total), George weighs 4 bags from that day’s production. If the average of the means is 14 oz. and the average range is 0.4 oz., what is the lower control limit for an x-bar chart for this process? a. 13.7084 oz.

b. 13.8768 oz.

c. 14.2916 oz.

d. 12.8000 oz.

e. 13.5908 oz.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
This figure consists of a rectangle and semicircle. what is the perimeter of this figure use 3.14 for pi 60.84m 72.84m 79.68m 98.52m
Answers: 2
question
Mathematics, 21.06.2019 19:10
The linear combination method is applied to a system of equations as shown. 4(.25x + .5y = 3.75) → x + 2y = 15 (4x – 8y = 12) → x – 2y = 3 2x = 18 what is the solution of the system of equations? (1,2) (3,9) (5,5) (9,3)
Answers: 1
question
Mathematics, 21.06.2019 23:30
Select the correct answer from each drop-down menu. james needs to clock a minimum of 9 hours per day at work. the data set records his daily work hours, which vary between 9 hours and 12 hours, for a certain number of days. {9, 9.5, 10, 10.5, 10.5, 11, 11, 11.5, 11.5, 11.5, 12, 12}. the median number of hours james worked is . the skew of the distribution is
Answers: 3
question
Mathematics, 22.06.2019 00:10
Write the slope intercept equation for line ab.
Answers: 2
You know the right answer?
Each day for two workweeks (10 days total), George weighs 4 bags from that day’s production. If the...
Questions
Questions on the website: 13722360