subject
Mathematics, 16.10.2020 19:01 kathleensumter5100

Two crews of highway workers are repaving a highway, Crew 1 has 6 workers and Crew 2 has 8 workers. In 4 days of work, Crew 1 repaved 2 miles of the highway. In 5 days of work, Crew 2 repaved 3 miles of the highway.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:10
Abc will undergo two transformations to give aa'b'c' which pair of transformations will give a different image of aabc if the order of the transformations is reversed? a. a rotation 90' counterclockwise about the origin followed by a reflection across the y-axis b a translation 5 units down followed by a translation 4 units to the right c. a reflection across the x-axis followed by a reflection across the y-axis a rotation 180'clockwise about the ongin followed by a reflection across the y-axis reset next 2 omentum all rights reserved o atk me anything o o e
Answers: 1
question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 1
question
Mathematics, 21.06.2019 23:40
Sanjay solved the equation below. which property did he use to determine that 7x+42=42 is equivalent to 7(x+6)=42 7x+42=42 7x=0 x=0
Answers: 1
question
Mathematics, 22.06.2019 02:40
Which method of gathering data will be most effective in learning how diet and fitness choices affect long-term healt
Answers: 1
You know the right answer?
Two crews of highway workers are repaving a highway, Crew 1 has 6 workers and Crew 2 has 8 workers....
Questions
Questions on the website: 13722363