subject
Mathematics, 16.10.2020 16:01 tyliyahmiles99

A contractor bought 8?2 ft2 9f sheets of metal. she has used 3.5ft2 so far has 84.60 worth of sheets metal remaining. the equation 8.2x-3.5x=84.6 represents how much sheet is remening and the cost of the remaining. how much does the sheet metal cost per square foot?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
What is the product of the radical expression. (7-2square root) (8+2 square root)
Answers: 2
question
Mathematics, 21.06.2019 18:00
Jenisey has $24 to spend on seven pencils. after buying them she had $10. how much did each pencil cost.?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Aplot of land has been surveyed for a new housing development with borders ab, bc, dc, and da. the plot of land is a right trapezoid with a height of 60 feet and an opposite leg length of 65 feet
Answers: 1
question
Mathematics, 21.06.2019 19:10
The linear combination method is applied to a system of equations as shown. 4(.25x + .5y = 3.75) → x + 2y = 15 (4x – 8y = 12) → x – 2y = 3 2x = 18 what is the solution of the system of equations? (1,2) (3,9) (5,5) (9,3)
Answers: 1
You know the right answer?
A contractor bought 8?2 ft2 9f sheets of metal. she has used 3.5ft2 so far has 84.60 worth of sheets...
Questions
question
English, 07.01.2020 04:31
question
Mathematics, 07.01.2020 04:31
Questions on the website: 13722367