A contractor claims that she finishes a job on time 90% of the time. Last month, she only completed 7 out of her 10 jobs on time. To see if this is surprisingly low, a simulation was conducted 100 times under the assumption that she really does complete 90% of her jobs on time. The dotplot contains 100 trials of this simulation.

Based on this dotplot and the sample of last month’s on-time completions, which conclusion can be drawn?

The contractor’s true, on-time completion rate is only 50%.
It is most likely that the contractor will complete about 9 out of 10 jobs.
If we used a larger sample size of 40 jobs, the simulated dotplot would be different; therefore, we cannot draw a conclusion.
The dotplot does not provide convincing evidence that her true, on-time completion rate is less than 90% because 7 or fewer on-time completions happened 19% of the time in the simulation.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Which expression is equivalent to 2^4y^3
Answers: 2
question
Mathematics, 21.06.2019 17:00
Write an equation in point-slope form for the line through the given point that has the given slope (-2,-7); m=-3/2
Answers: 2
question
Mathematics, 21.06.2019 20:30
This is about circle theorems. someone asap : (
Answers: 1
question
Mathematics, 21.06.2019 21:00
Simplify. 4+3/7x-2-2/7x a. 2-5/7x b. 6-1/7x c. 2+1/7x d. 6+5/7x
Answers: 1
You know the right answer?
A contractor claims that she finishes a job on time 90% of the time. Last month, she only completed...
Questions
question
History, 26.02.2021 21:00
question
Physics, 26.02.2021 21:00
question
Mathematics, 26.02.2021 21:00
question
Mathematics, 26.02.2021 21:00
Questions on the website: 13722367