subject
Mathematics, 22.10.2020 17:01 danding1593

A tortoise challenged a hare to a 100-meter race on a track. The tortoise negotiated a 60-meter head start with the hare. When they passed their respective starting points the hare was running at a constant speed of 3.6 meters per second and the tortoise was crawling at a speed of 0.7 meters per second. (They both maintained these speeds for the entire race.) Our goal is to determine who won the race. Take out a piece of paper and read the above problem statement again. In a couple of sentences, describe how you might determine who won the race. Construct a drawing to represent the 100-meter length of the track. Then place the tortoise and hare's starting points on the track. Define the variable t to represent the number of seconds since the start of the race.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Acollege is planning to construct a rectangular parking lot on land bordered on one side by a highway. the plan is to use 680 feet of fencing to fence off the other three sides. what dimensions should the lot have if the enclosed area is to be a maximum?
Answers: 3
question
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 3
question
Mathematics, 21.06.2019 21:30
Julie goes to the sports store and spends $40.50 before tax. she buys a pair of shorts for $21.75 and 3 pairs of socks that each cost the same amount. how much does each pair of socks cost? $$
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
A tortoise challenged a hare to a 100-meter race on a track. The tortoise negotiated a 60-meter head...
Questions
question
English, 12.11.2020 03:40
question
Mathematics, 12.11.2020 03:40
question
Mathematics, 12.11.2020 03:40
question
History, 12.11.2020 03:40
question
Mathematics, 12.11.2020 03:40
question
English, 12.11.2020 03:40
Questions on the website: 13722367