A Digging Mistake
158 ft
B
An engineering company was hired to dig an underground tunne...
Mathematics, 29.10.2020 01:40 awsomeboy12345678
A Digging Mistake
158 ft
B
An engineering company was hired to dig an underground tunnel directly from
point A to point B which was a distance of 1.4 miles. By mistake, however, they
tunneled from point A to point C. Then they tunneled from point to point B. If
tunneling costs about $120 million per mile, about how much money was wasted?
Show how you found your answer. (Note: 1 mile = 5,280 feet.)
Answers: 3
Mathematics, 21.06.2019 17:30
Asphere has a diameter of 10 in. what is the volume of the sphere?
Answers: 1
Mathematics, 21.06.2019 17:40
An apartment has a replacement cost of $950,000 and contents valued at $1,450,000. it has a classification of a and a territory rating of 3. find the annual premium a) $10,185 b) $9,230 c) $3,155 d) $13,830
Answers: 2
Mathematics, 21.06.2019 17:40
The perimeter of a rectangle is greater than or equal to 74 meters. if the length is 25 meters, the minimum width of the rectangle is meters.
Answers: 2
Arts, 26.08.2020 20:01
Biology, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
History, 26.08.2020 20:01
Computers and Technology, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
Geography, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
Chemistry, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
English, 26.08.2020 20:01
Mathematics, 26.08.2020 20:01
Chemistry, 26.08.2020 20:01