subject
Mathematics, 05.11.2020 05:40 xxaurorabluexx

A contractor bought 7.6 ft2 of sheet metal. He has used 2.3 ft2 so far and has $95.40 worth of sheet metal remaining. The equation 7.6x−2.3x=95.4 represents how much sheet metal is remaining and the cost of the remaining amount. How much does sheet metal cost per square foot? Sheet metal costs $? per square foot

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Jack lives on a farm and has a large backyard. the area of his rectangular backyard is of a square mile. if the width of the yard is of a mile, what fraction of a mile is the length of the rectangular backyard?
Answers: 2
question
Mathematics, 21.06.2019 15:40
Marya wants to factor the polynomial 36x^3 -22x^2 - 144x.which term can she add to the polynomial that would not change its grestest common factor? check all that apply
Answers: 3
question
Mathematics, 21.06.2019 16:40
The graph of which equation includes the points (0, 10) and (10, 11)? y = 10x + 11 y = x + 10 y= 1/10x + 10 y = 1/10x + 11
Answers: 1
question
Mathematics, 21.06.2019 19:10
What is the anwers for 9+2x=5x-3-x
Answers: 2
You know the right answer?
A contractor bought 7.6 ft2 of sheet metal. He has used 2.3 ft2 so far and has $95.40 worth of sheet...
Questions
question
English, 20.02.2022 09:10
Questions on the website: 13722367