Mathematics, 15.10.2019 20:30 Terrydactly

If 6 men take 3 days to dig 8 ditches, then how long would it take 4 men to dig 10 ditches?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
Mr. walker gave his class the function f(x) = (x + 3)(x + 5). four students made a claim about the function. each student’s claim is below. jeremiah: the y-intercept is at (15, 0). lindsay: the x-intercepts are at (–3, 0) and (5, 0). stephen: the vertex is at (–4, –1). alexis: the midpoint between the x-intercepts is at (4, 0). which student’s claim about the function is correct?
Answers: 2
question
Mathematics, 21.06.2019 15:00
The radius of the base of a cylinder is 10 centimeters, and its height is 20 centimeters. a cone is used to fill the cylinder with water. the radius of the cone's base is 5 centimeters, and its height is 10 centimeters.
Answers: 1
question
Mathematics, 21.06.2019 17:00
Can someone answer this question? : )
Answers: 1
question
Mathematics, 21.06.2019 23:30
Segment wx is shown explain how you would construct a perpendicular bisector of wx using a compass and a straightedge
Answers: 3
You know the right answer?
If 6 men take 3 days to dig 8 ditches, then how long would it take 4 men to dig 10 ditches?...
Questions
question
Mathematics, 04.11.2019 19:31
question
Mathematics, 04.11.2019 19:31
question
Mathematics, 04.11.2019 19:31
question
Mathematics, 04.11.2019 19:31
question
Mathematics, 04.11.2019 19:31
Questions on the website: 13722359