subject
Mathematics, 22.11.2020 14:00 lele650

If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take 10 men to dig same hole 7 metres deep?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Aplot of land is shaped like a quadrilateral. fences are built on the diagonal to divide the area into 4 sections. what is vi to the nearest tenth? gv = 6.55fv = 5.84vh = 3.27vi = ?
Answers: 1
question
Mathematics, 21.06.2019 21:20
Find the missing variable for a parallelogram: a = latex: 28in^2 28 i n 2 h = b = 6.3 in (1in=2.54cm)
Answers: 3
question
Mathematics, 21.06.2019 22:50
Which will form a composite function?
Answers: 1
question
Mathematics, 22.06.2019 01:40
At wind speeds above 1000 centimeters per second (cm/sec), significant sand-moving events begin to occur. wind speeds below 1000 cm/sec deposit sand and wind speeds above 1000 cm/sec move sand to new locations. the cyclic nature of wind and moving sand determines the shape and location of large dunes. at a test site, the prevailing direction of the wind did not change noticeably. however, the velocity did change. fifty-nine wind speed readings gave an average velocity of x = 1075 cm/sec. based on long-term experience, σ can be assumed to be 245 cm/sec. (a) find a 95% confidence interval for the population mean wind speed at this site. (round your answers to the nearest whole number.) lower limit cm/sec upper limit cm/sec
Answers: 2
You know the right answer?
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take 10 men to dig same hole...
Questions
question
Mathematics, 30.03.2020 03:32
question
Mathematics, 30.03.2020 03:32
question
Engineering, 30.03.2020 03:32
question
Mathematics, 30.03.2020 03:32
question
Mathematics, 30.03.2020 03:34
question
Mathematics, 30.03.2020 03:34
Questions on the website: 13722360