subject
Mathematics, 24.11.2020 08:00 jose0765678755

Two machines. Just completed projects at the same time. Machine A completes a project every 1.25 minutes. Machine B completes a project every 4.5 minutes. How long will it be until both machines complete a project

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
In a school 2/3 of the students study a language of those who study a language 2/5 study french
Answers: 2
question
Mathematics, 21.06.2019 17:00
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 3
question
Mathematics, 21.06.2019 21:30
Yesterday, george drank 1 small bottle and 2 large bottles, for a total of 1,372 grams. the day before , he drank 1 small bottle and 1 large bottle, for the total of 858 grams. how many grams does each bottle hold?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Apasta salad was chilled in the refrigerator at 35° f overnight for 9 hours. the temperature of the pasta dish dropped from 86° f to 38° f. what was the average rate of cooling per hour?
Answers: 3
You know the right answer?
Two machines. Just completed projects at the same time. Machine A completes a project every 1.25 min...
Questions
question
Mathematics, 18.03.2021 01:50
Questions on the website: 13722362