subject
Mathematics, 27.11.2020 22:20 greg777

A cereal packing machine fill 15 oz boxes at a rate of 3 boxes every 2 minutes. production has scheduled 600 lbs to be processed during each 8-hour shift. Approoximately how many minutes of down time will the machine have during each shift.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Aiden buys two bags of chips at $1.09 each and a 20 ounce soda for $1.20 at the gas station.he knows that the state tax is 5.5. how much change will he receive from a $5 bill?
Answers: 1
question
Mathematics, 21.06.2019 21:20
52 cm radius = diameter = area = circumference = circumfer
Answers: 1
question
Mathematics, 21.06.2019 22:30
Which statement shows that 6.24 is a rational number? a. 6.24 = 6.242424 b. 6.24 = 6.24 c. 6.24 = 68⁄33 d. 6.24 = 66⁄25
Answers: 1
question
Mathematics, 21.06.2019 23:00
Who long does it take to drive 150 miles at 45 miles per hour
Answers: 2
You know the right answer?
A cereal packing machine fill 15 oz boxes at a rate of 3 boxes every 2 minutes. production has sched...
Questions
question
Mathematics, 05.10.2020 14:01
question
Spanish, 05.10.2020 14:01
Questions on the website: 13722362