subject
Mathematics, 28.11.2020 14:00 babygirl6571

The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires 6 hours to assembly and 2 finishing work units for finishing work, the home model requires 4 hours to assemble and 12 finishing work units for finishing. The maximum number of assembly hours available is 96 per day, and the maximum number of finishing hours available is 96 per day. Let
x = the number of office model shredders produced per day and
y = the number of home model shredders produced per day.

Write the system of inequalities that represents the maximum number of shredders that can be produced in one day.

NOTE: 4 inequalities are expected.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Write the summation to estimate the area under the curve y = 1 + x2 from x = -1 to x = 2 using 3 rectangles and right endpoints
Answers: 1
question
Mathematics, 21.06.2019 21:20
If two angles of a triangle have equal measures and the third angle measures 90°, what are the angle measures of the triangle? a. 60°, 60°, 60° b. 45°, 90°, 90° c. 30°, 30°, 90° d. 45°, 45°, 90°
Answers: 2
question
Mathematics, 21.06.2019 21:30
Yo need asap pls ! markin da brainiest too !
Answers: 1
question
Mathematics, 21.06.2019 22:00
(05.03 mc) part a: explain why the x-coordinates of the points where the graphs of the equations y = 4x and y = 2x−2 intersect are the solutions of the equation 4x = 2x−2. (4 points) part b: make tables to find the solution to 4x = 2x−2. take the integer values of x between −3 and 3. (4 points) part c: how can you solve the equation 4x = 2x−2 graphically? (2 points)
Answers: 1
You know the right answer?
The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires...
Questions
question
Spanish, 20.10.2019 18:30
question
Geography, 20.10.2019 18:30
Questions on the website: 13722360