subject
Mathematics, 01.12.2020 04:20 shaelyn0920

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 10 child bikes and 12 adult bikes in a week. (2 points) No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100

No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Polynomial that can be factored as (3x-4)(3x+4)
Answers: 1
question
Mathematics, 21.06.2019 21:00
Calculate the missing value. round the answer to on decimal place. start with 70, increase it by 21%, and end up with
Answers: 2
question
Mathematics, 21.06.2019 21:30
Which of the following shows the length of the third side, in inches, of the triangle below
Answers: 2
question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 1
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Questions
question
Computers and Technology, 04.07.2020 04:01
question
Chemistry, 04.07.2020 04:01
Questions on the website: 13722362