subject
Mathematics, 02.12.2020 20:40 nefertiri64

Un grupo de constructores, trabajando 10 horas diarias, ha construido 600 2
metro
de un muro en 18 días.

¿Cuántos metros cuadrados construirán en 15 días, trabajando 8 horas al día?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
(03.03 mc) choose the graph below that correctly represents the equation 2x + 4y = 24. (5 points) select one: a. line through the points 0 comma 6 and 12 comma 0 b. line through the points 0 comma negative 6 and 12 comma 0 c. line through the points 0 comma negative 12 and 6 comma 0 d. line through the points 0 comma 12 and 6 comma 0
Answers: 1
question
Mathematics, 21.06.2019 22:20
The coordinates of vortex a’ are (8,4) (-4,2) (4,-,4) the coordinates of vortex b’ are (6,6)(12,-,12)(12,12) the coordinates of vortex c’ are(-2,,12)(4,12)(12,-4)
Answers: 3
question
Mathematics, 21.06.2019 22:30
3. a sum of $2700 is to be given in the form of 63 prizes. if the prize is of either $100 or $25, find the number of prizes of each type.
Answers: 1
question
Mathematics, 22.06.2019 00:00
What is the measure of each of the two angles formed by the bisector of the diagonal of a rhombus if the original angle measures 58 degrees?
Answers: 1
You know the right answer?
Un grupo de constructores, trabajando 10 horas diarias, ha construido 600 2
metro
de un...
Questions
question
Mathematics, 12.10.2020 20:01
question
Mathematics, 12.10.2020 20:01
question
Mathematics, 12.10.2020 20:01
Questions on the website: 13722363