subject
Mathematics, 06.12.2020 07:10 ellisc7044

This Question: 1 pt The cost C in dollars of manufacturing x bicycles at a production plant is given by the function shown below.
C(x) = 3x?
- 600x + 40,500
a. Find the number of bicycles that must be manufactured to minimize the cost.
b. Find the minimum cost.
a. How many bicycles must be manufactured to minimize the cost?
bicycles
b. What is the minimum cost?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
15/16 as a decimal rounded to the nearest hundredth
Answers: 2
question
Mathematics, 21.06.2019 22:00
Liz is shipping a package to her friend. the maximum weight of a medium flat-rate box is 20 pounds, including the box which weighs 6 ounces. write and solve an inequality to describe the possible weight in pounds, w, of the contents that liz will ship to her friend if she must use a medium flat-rate box. use the drop-down menus to explain your answer.
Answers: 2
question
Mathematics, 21.06.2019 23:30
Solve the following: 12(x^2–x–1)+13(x^2–x–1)=25(x^2–x–1) 364x–64x=300x
Answers: 1
question
Mathematics, 21.06.2019 23:30
Which of the following vectors are orthogonal to (2,1)? check all that apply
Answers: 1
You know the right answer?
This Question: 1 pt The cost C in dollars of manufacturing x bicycles at a production plant is give...
Questions
question
Mathematics, 21.01.2021 22:10
question
Business, 21.01.2021 22:10
Questions on the website: 13722366