subject
Mathematics, 08.12.2020 14:00 erikloza12pdidtx

A company makes two types of leather belts A and B. Belt A is of high quality and belt of lower quality. The respective profits are Rs. 0.4 and rs. 0.3 per belt. Each
belt of type A requires twice as much time as a belt of type B, and if all belts were of
type B the company could make 1000 per day. The supply of leather is sufficient for
only 800 belts per day. Belt A requires a fancy buckle and only 400 per day
available. There are only 700 buckles a day available for belt B. set up LPP and find
its solution by graphical method.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Express in the simplest form: (x^2+9x+14/x^2-49) / (3x+6/x^2+x-56)
Answers: 3
question
Mathematics, 21.06.2019 21:00
When solving this problem: 3025/5.5 = a/90.75 you get 49912.5 which would be the length of one of the sides of a square when the area is only 90.75 inches. is that answer correct, why, and how is it possible?
Answers: 1
question
Mathematics, 21.06.2019 22:30
The given diagram shows the parts of a right triangle with an altitude to the hypotenuse. using the two given  measures, find the other four.
Answers: 1
question
Mathematics, 22.06.2019 03:20
Each unit cost 14p, how much would 942 units cost?
Answers: 1
You know the right answer?
A company makes two types of leather belts A and B. Belt A is of high quality and belt of lower qua...
Questions
question
Mathematics, 10.05.2021 20:20
question
Mathematics, 10.05.2021 20:20
question
Social Studies, 10.05.2021 20:20
question
Mathematics, 10.05.2021 20:20
question
Social Studies, 10.05.2021 20:20
question
Mathematics, 10.05.2021 20:20
question
Mathematics, 10.05.2021 20:20
question
Mathematics, 10.05.2021 20:20
Questions on the website: 13722360