Which of these numbers of simulations of an event would be most likely to produce results that are closest to those predicted by probability theory? 15, 20, 5, 10
Answers: 2
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:00
Which of the following will form the composite function?
Answers: 1
Mathematics, 22.06.2019 00:30
What is the perimeter of an equilateral triangle if each side is (x+3)?
Answers: 1
- 8.5а - 4.5+ За = - 24.5...
Chemistry, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Physics, 23.03.2021 22:40
Chemistry, 23.03.2021 22:40
English, 23.03.2021 22:40
History, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
English, 23.03.2021 22:40
Geography, 23.03.2021 22:40
Arts, 23.03.2021 22:40