A factory process requires 3 steps to finish a product. The steps each have a mean completion time of h = 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is
independent from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen
product.
Find the mean of T.
pir=
seconds

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
What is the first step of an indirect proof of a number that is divisible by two
Answers: 2
question
Mathematics, 21.06.2019 18:00
Manny bought 12 pounds of vegetables at the supermarket. 75% of the vegetables were on sale. how many pounds of vegetables were not on sale? 98 points : )
Answers: 2
question
Mathematics, 21.06.2019 18:30
The base of a triangle exceeds the height by 9 inches. if the area is 180 square inches, find the length of the base and the height of the triangle.
Answers: 3
question
Mathematics, 21.06.2019 23:40
What is the equation, in point-slope form, of the line that has a slope of 6 and passes through the point (–1, –8)? a. y+8 = 6 (x+1 )
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
question
SAT, 07.01.2020 19:31
question
Mathematics, 07.01.2020 19:31
question
Mathematics, 07.01.2020 19:31
question
Mathematics, 07.01.2020 19:31
Questions on the website: 13722360