subject
Mathematics, 14.01.2021 06:20 ToonGamesToo

A construction company is considering submitting bids for two contracts. It will cost the company $10,000 to prepare and submit the bids, and if won, each bid would produce $50,000 of income to the company. The company estimates that it has a 10% chance of winning any given bid. Here is the probability distribution of X= the number of bids the company wins, and M = the amount of money the company profits from the bids.

Find the mean of X


A construction company is considering submitting bids for two contracts. It will cost the company $

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Will used 20 colored tiles to make a design in art class. 5/20 of his tiles were red. what is an equivalent fraction for the red tiles?
Answers: 1
question
Mathematics, 21.06.2019 21:20
Paul’s car is 18 feet long. he is making a model of his car that is 1/6 the actual size. what is the length of the model?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Nine people are going to share a 128-ounces bottle of soda. how many ounces will each person get drink? choose the correct equation and answer for this situation
Answers: 1
question
Mathematics, 21.06.2019 22:30
Sketch the vector field vector f( vector r ) = 8vector r in the xy-plane. select all that apply. the length of each vector is 8. the lengths of the vectors decrease as you move away from the origin. all the vectors point away from the origin. all the vectors point in the same direction. all the vectors point towards the origin. the lengths of the vectors increase as you move away from the origin.
Answers: 2
You know the right answer?
A construction company is considering submitting bids for two contracts. It will cost the company $1...
Questions
question
Health, 25.11.2020 14:00
question
Mathematics, 25.11.2020 14:00
question
Computers and Technology, 25.11.2020 14:00
question
Mathematics, 25.11.2020 14:00
Questions on the website: 13722367