A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 20 child bikes and 6 adult bikes in a week. (2 points)
No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100
Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100
Answers: 1
Mathematics, 21.06.2019 14:00
Acompany is testing in comparing to lightbulb designs the box plot shows the number of hours that each lightbulb design last before burning out which statement is best supported by the information of the plot
Answers: 3
Mathematics, 21.06.2019 18:00
He that is measured at 220° is a reflex angle. the opposite angle is obtuse. find the measure of obtuse .
Answers: 1
Mathematics, 21.06.2019 18:30
Can someone me do math because i am having a breakdown rn because i don’t get it
Answers: 1
Mathematics, 21.06.2019 22:30
Which of the following is an example of a rational number? a. π b. √ 9 c. √ 8 d. 3.8362319
Answers: 1
I NEED HEL ITS TIMED PLEASSE HURRY AND I WILL GIVE BRAINLIES
A bicycle manufacturing company makes...
History, 16.03.2020 22:13
Social Studies, 16.03.2020 22:13
English, 16.03.2020 22:13
Mathematics, 16.03.2020 22:13