Mathematics, 22.01.2021 20:00 sherylpoche23
One day, the system stops working correctly. The faucet starts to fill the aquarium at a rate of 30 liters per minute, and the drain opens at the same time, draining the water at a rate of 20 liters per minute.
Answers: 1
Mathematics, 21.06.2019 15:30
Question 7 of 47 1 point what is the equation of a line with a slope of 1/2 that passes through the point, (-2,5)? o a. 1/2x+3 o b. y=1/2x+5 o c. y=x+5 o d. y=1/2x+6
Answers: 3
Mathematics, 21.06.2019 19:00
What is the expression in factored form? 3x^2 + 18x + 24 a. 3(x+2)(x+4) b. 3(x-2)(x+4) c. 3(x-2)(x-4) d. 3(x+2)(x-4)
Answers: 2
Mathematics, 21.06.2019 21:30
If t17 = 3 (t5) in an arithmetic progression, find t1 in terms of d.
Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
One day, the system stops working correctly. The faucet starts to fill the aquarium at a rate of 30...
Mathematics, 06.05.2020 08:34
Advanced Placement (AP), 06.05.2020 08:34
English, 06.05.2020 08:34
English, 06.05.2020 08:34