Mathematics, 24.01.2021 06:30 oscar3231

On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel processing plant is
modeled by G(t) = 90 + 45 cos (t), where t is
measured in hours and 0 the workday (t=0), the plant has 500 tons of unprocessed
gravel. During the hours of operations, 0 plant processes gravel at a constant rate of 100 tons per
hour.
d.) what is the maximum amount of unprocessed gravel
at the plant during the hours of operation on this
workday. Justify your answer.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Why do interests rates on loans to be lower in a weak economy than in a strong one
Answers: 3
question
Mathematics, 21.06.2019 17:00
In triangle opq right angled at p op=7cm,oq-pq=1 determine the values of sinq and cosq
Answers: 1
question
Mathematics, 21.06.2019 21:30
Af jewelry box is in the shape of a rectangular prism with an area of 528 cube inches. the length of the box is 12 inches and the height is 5 1/2 inches. what is the width of the jewelry box
Answers: 1
question
Mathematics, 21.06.2019 23:00
Sara made $253 for 11 hours of work. at the same rate how much would he make for 7 hours of work?
Answers: 2
You know the right answer?
On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel p...
Questions
question
Mathematics, 06.08.2021 18:50
question
Mathematics, 06.08.2021 18:50
Questions on the website: 13722362