A construction team gives an estimate of three months to repave a large stretch of a very busy road with their core crew of 9 people. The government responds that it is too much of an inconvenience to have this busy road obstructed for three months, so the job must be completed in one month. If the relationship between construction time and crew members is inversely proportional, how many crew members does the construction team need if they are to complete the job in one month

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
If the dimensions of a rectangular prism are 5 ft x 3.5 ft x 2 ſt, what is the surface area?
Answers: 1
question
Mathematics, 21.06.2019 22:00
If i had 1234 apples and 1 banana what is the total amount
Answers: 2
question
Mathematics, 22.06.2019 03:30
Right triangle abc has three sides with lengths ab= 119, bc = 169, ca= 120. find the value of cos c. hint: draw and label the triangle. the hypotenuse is always the longest.
Answers: 2
question
Mathematics, 22.06.2019 04:00
Identify reflection rule on a coordinate plane that verifies that triangle a(-1,7), b(6,5), c(-2,2) and a’(-1,-7), b(6,-5), c’(-2,2) triangle are congruent when reflected over the x-axis
Answers: 1
You know the right answer?
A construction team gives an estimate of three months to repave a large stretch of a very busy road...
Questions
Questions on the website: 13722360