subject
Mathematics, 28.01.2021 08:00 jjdj5218

In a recent issue of the IEEE Spectrum, 84 engineering conferences were announced. Four conferences lasted two days. Thirty-six lasted three days. Eighteen lasted four days. Nineteen lasted five days. Four lasted six days. One lasted seven days. One lasted eight days. One lasted nine days. Let X = the length (in days) of an engineering conference.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which of the following is the missing term, a2, of the geometric sequence in which a1=2 and a3=200
Answers: 2
question
Mathematics, 21.06.2019 17:00
Somone me i want to know what 18 hours out of 24 hours in a fraction
Answers: 1
question
Mathematics, 21.06.2019 17:40
The perimeter of a rectangle is greater than or equal to 74 meters. if the length is 25 meters, the minimum width of the rectangle is meters.
Answers: 2
question
Mathematics, 21.06.2019 20:50
Afarmer has a large field that is x feet in length. he wants to fence in a rectangular section in the middle of the field , leaving a length of 100 feet of open field behind each end of the fenced rectangle.he also wants the width of the fenced-in space to be 100 feet less than its length. find the expressions to represent the length and width of the fenced section of the field
Answers: 2
You know the right answer?
In a recent issue of the IEEE Spectrum, 84 engineering conferences were announced. Four conferences...
Questions
Questions on the website: 13722363