subject
Mathematics, 01.02.2021 18:30 sabel1234

A bicycle factory installs about 400 tires per day. Tires are installed Monday through Friday for 8 hours per day. The manager of the factory estimates the number of properly installed tires per week using the process below.
In the first hour of work on Monday, 49 out of 50 tires were properly installed.
So, there were about 8(49) = 392 properly installed tires on Monday.
Considering 5 working days per week, 5(392) - 1,960 is the number of tires properly installed in one week.
Which best explains the validity of the results?
The results are likely invalid because it is unlikely that the tires installed in one hour on Monday will represent the
O
entire population of tires.
O The results are likely invalid because the entire population during one week was not part of the sample.
The results are likely valid because a large number of tires produced during the week were part of the sample.
O The results are likely valid because each tire sampled was part of the population of tires that week.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
You are looking at two area rugs for your bedroom. one is a square with side lengths of 6.3 feet. the other is a rectangle that is 4.8 feet by 8.2 feet. which rug will cover the greatest area? how much more area will it cover? with work plzz and u so much
Answers: 1
question
Mathematics, 21.06.2019 14:00
Solve - pv + 40 < 65 for v solve 7w - 3r = 15 for r
Answers: 1
question
Mathematics, 21.06.2019 18:30
Ineed me i stuck and i don’t want to get it wrong
Answers: 1
question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 1
You know the right answer?
A bicycle factory installs about 400 tires per day. Tires are installed Monday through Friday for 8...
Questions
question
Mathematics, 27.05.2020 15:57
Questions on the website: 13722362