subject
Mathematics, 02.02.2021 23:40 Bryson2148

A construction company can remove 6 1/2 metric tons of dirt from a construction site in 3 1/8 hours. What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Amuffin recipe, which yields 12 muffins, calls for cup of milk for every 1 cups of flour. the same recipe calls for cup of coconut for every cup of chopped apple. to yield a batch of 30 muffins, how much flour will be needed in the mix?
Answers: 1
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
question
Mathematics, 21.06.2019 20:50
These tables represent a quadratic function with a vertex at (0, -1). what is the average rate of change for the interval from x = 9 to x = 10?
Answers: 2
question
Mathematics, 21.06.2019 23:30
Tim earns $120 plus $30 for each lawn he mows.write an iniqualityvto represent how many lawns he needs to mow to make more than $310
Answers: 2
You know the right answer?
A construction company can remove 6 1/2 metric tons of dirt from a construction site in 3 1/8 hours....
Questions
question
Mathematics, 11.10.2020 20:01
question
Mathematics, 11.10.2020 20:01
question
Mathematics, 11.10.2020 20:01
Questions on the website: 13722361