subject
Mathematics, 08.02.2021 20:40 andreawright13

At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per minute, and Machine B can pack 11 boxes per minute. Before shipment, an inspector found that 7 of
the boxes packed by Machine A were defective and could not be shipped. At least 200 boxes packed
by Machine A were approved for shipment. Write and solve an inequality to find the amount of time
Machine A spent packing the boxes that were approved for shipment.


At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per

m

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 23:30
Simplify this expression. 8x 16(x + y)
Answers: 1
question
Mathematics, 22.06.2019 00:30
If you were constructing a triangular frame, and you had wood in the length of 4inches, 4 inches, and 7 inches, would it make a triangle? would you be able to create a frame from these pieces of wood? yes or no. explain your mathematical thinking
Answers: 2
question
Mathematics, 22.06.2019 01:20
Construct a box plot to represent the ages of the actors in a play. step 1: arrange the numbers in order from lowest (on the left) to highest. 24 18 30 26 24 33 32 44 25 28
Answers: 3
question
Mathematics, 22.06.2019 01:30
Recall that two angles are complementary if the sum of their measures is? 90°. find the measures of two complementary angles if one angle is twenty dash nine times the other angle.
Answers: 2
You know the right answer?
At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per min...
Questions
question
Mathematics, 14.01.2021 22:30
question
Chemistry, 14.01.2021 22:30
question
Mathematics, 14.01.2021 22:30
question
Computers and Technology, 14.01.2021 22:30
question
Mathematics, 14.01.2021 22:30
question
Mathematics, 14.01.2021 22:30
question
Mathematics, 14.01.2021 22:30
question
Mathematics, 14.01.2021 22:30
Questions on the website: 13722367