subject
Mathematics, 11.02.2021 20:50 monai2005

A company produces two types of bicycles; mountain bikes and racing bikes. It takes 5 hours of assembly time and 4 hours of mechanical tuning to produce a mountain bike. It takes 10 hours of assembly time and 2 hours of mechanical tuning to produce a racing bike. The company has at most 23 hours of mechanical tuning labor per week and at most 152 hours of assembly labor per week. The company's profit is $40 for each mountain bike produced and $140 for each racing bike produced. The company wants to make as much money as possible. Let x = the number of mountain bikes they produce, and let y = the number of racing bikes they produce. What are the constraints for this problem?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:40
Which expression is equivalent to (4x^3*y^5)(3x^5*y)^2 \a) 24x^13*y^7b) 36x^13*y^7c) 36x^28*y^7d) 144x^16*y^12
Answers: 1
question
Mathematics, 21.06.2019 14:30
The expression 6x2 gives the surface area of a cube, and the expression x3 gives the volume of a cube, where x is the length of one side of the cube. find the surface area and the volume of a cube with a side length of 6m
Answers: 3
question
Mathematics, 21.06.2019 16:40
Identify an equation in point slope form for the line perpendicular to y=3x+5 that passes through (4,-1)
Answers: 2
question
Mathematics, 21.06.2019 16:50
Kapil needed to buy a long wooden beam. he went to two sawmills that each charge an initial fee plus an additional fee for each meter of wood. the following equation gives the price (in dollars) of a wooden beam from the first sawmill as a function of its length (in meters). p = 5+20xp=5+20x
Answers: 1
You know the right answer?
A company produces two types of bicycles; mountain bikes and racing bikes. It takes 5 hours of assem...
Questions
question
Mathematics, 30.03.2021 22:30
question
Mathematics, 30.03.2021 22:30
question
Mathematics, 30.03.2021 22:30
Questions on the website: 13722362