subject
Mathematics, 19.02.2021 08:30 marialuizavalen

Ramit can finish his work in 25 days, working eight hours a day. If he war finish the same work in 20 days, how many hours should he work in a day?
of work will be o​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Assume that a population of 50 individuals has the following numbers of genotypes for a gene with two alleles, b and b: bb = 30, bb = 10, and bb = 10. calculate the frequencies of the two alleles in the population’s gene pool.
Answers: 2
question
Mathematics, 21.06.2019 19:00
What are the solutions of the equation? 6x^2 + 11x + 4 = 0 a. 4/3, 1/2 b. -4/3, -1/2 c. 4/3, -1/2 d. -4/3, 1/2
Answers: 2
question
Mathematics, 21.06.2019 19:30
The length of a shadow of the building is 36m. the length of the pole, which is perpendicular to the ground, is 1.9m. the length of the pole's shadow is 1.52m. what is the height of the building?
Answers: 1
question
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
You know the right answer?
Ramit can finish his work in 25 days, working eight hours a day. If he war finish the same work in...
Questions
question
Mathematics, 17.11.2020 04:40
question
History, 17.11.2020 04:40
question
Mathematics, 17.11.2020 04:40
Questions on the website: 13722361