subject
Mathematics, 23.02.2021 16:10 Deavionaaaaa

8 workers complete a construction of a wall in 6 days. How many workers are needed to complete the construction in 4 days.​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:20
Factor and solve to find roots x squared -x - 90 =0
Answers: 1
question
Mathematics, 21.06.2019 23:40
For a science project, a high school research team conducted a survey of local air temperatures. based on the results of the survey, the found that the average temperatures were around 10 degrees higher than expected. this result was wrong. the trouble with the survey was that most of the locations were exposed to direct sunlight and located over asphalt or sand, which resulted in higher temperatures than normal. this is a classic example of an error in which phase of inferential statistics?
Answers: 1
question
Mathematics, 21.06.2019 23:50
Astudent draws two parabolas both parabolas cross the x axis at (-4,0) and (6,0) the y intercept of the first parabolas is (0,-12). the y intercept of the second parabola is (0,-24) what is the positive difference between the a values for the two functions that describe the parabolas
Answers: 3
question
Mathematics, 22.06.2019 01:00
Which graph shows the solution to the system of linear inequalities? y-4t< 4 y
Answers: 1
You know the right answer?
8 workers complete a construction of a wall in 6 days. How many workers are needed to complete the c...
Questions
Questions on the website: 13722367