A construction crew needs to pave a road that is 201 miles long. The crew paves 8 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the
following function.
L(d) = 201 - 8d
If 129 miles of the road is left to be paved, how many days has the crew been paving the
road?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Find the value of the variable and the length of each secant segment.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Acollection of coins has value of 64 cents. there are two more nickels than dimes and three times as many pennies as dimes in this collection. how many of each kind of coin are in the collection?
Answers: 1
question
Mathematics, 21.06.2019 23:30
The approximate line of best fit for the given data points, y = −2x − 2, is shown on the graph.which is the residual value when x = –2? a)–2 b)–1 c)1 d)2
Answers: 2
question
Mathematics, 22.06.2019 02:30
Iwill give brainliest. give accurate answer, . suppose tommy walks from his home at (0, 0) to the mall at (0, 5), and then walks to a movie theater at (6, 5). after leaving the theater tommy walks to the store at (6, 0) before returning home. if each grid square represents one block, how many blocks does he walk?
Answers: 2
You know the right answer?
A construction crew needs to pave a road that is 201 miles long. The crew paves 8 miles of the road...
Questions
question
Mathematics, 18.11.2020 03:40
question
Chemistry, 18.11.2020 03:40
Questions on the website: 13722363