Mathematics, 10.03.2021 01:00 lollipop83
During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range? (Note: 1kg = 2.2 lbs)
Answers: 1
Mathematics, 21.06.2019 17:50
Find the cosine function that is represented in the graph.
Answers: 1
Mathematics, 21.06.2019 23:20
Find the value of x in the diagram below. select the best answer from the choices provided
Answers: 1
Mathematics, 22.06.2019 00:30
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
History, 08.10.2021 21:50
Computers and Technology, 08.10.2021 22:00
English, 08.10.2021 22:00
Mathematics, 08.10.2021 22:00
Mathematics, 08.10.2021 22:00
Mathematics, 08.10.2021 22:00