Mathematics, 12.03.2021 19:30 gbeltran2302

The total number of hours h that a construction job will take to reach completion is related the the average daily number of workers w that are on the job site throughout the whole project. What type of variation represents the relationship between h and w?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Which of the following is the correct ratio for converting kilograms to grams
Answers: 3
question
Mathematics, 21.06.2019 19:10
With this question substitute t=3 and t=5 to determine if the two expressions are equivalent. 4(t + 3) 4t+12 which statements are true? check all that apply. a. the value of both expressions when t =5 is 32. b. the two expressions are not equivalent. c. the value of both expressions when t=3 is 15. d. the value of both expressions when t=5 is 23. e. the two expressions are equivalent. f. the value of both expressions when t=3 is 24.
Answers: 3
question
Mathematics, 21.06.2019 21:30
Aladder that is 20ft long is leaning against the side of a building. if the angle formed between the ladder and the ground is 75 degrees how far is the bottom of the from the base of the building?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
You know the right answer?
The total number of hours h that a construction job will take to reach completion is related the the...
Questions
question
English, 16.09.2019 02:00
question
English, 16.09.2019 02:00
question
Mathematics, 16.09.2019 02:00
question
Mathematics, 16.09.2019 02:00
Questions on the website: 13722362