A construction worker needs to pour a rectangular slab 27 ft​ long, 15 ft​ wide, and 4 in. thick. How many cubic yards of concrete does the worker​ need? (Assume that the construction worker cannot buy a fraction of a cubic yard of​ concrete.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Suppose that the price p (in dollars) and the weekly sales x (in thousands of units) of a certain commodity satisfy the demand equation 4p cubedplusx squaredequals38 comma 400. determine the rate at which sales are changing at a time when xequals80, pequals20, and the price is falling at the rate of $.20 per week.
Answers: 3
question
Mathematics, 21.06.2019 18:00
Place the following steps in order to complete the square and solve the quadratic equation,
Answers: 1
question
Mathematics, 21.06.2019 20:30
If there is 20 dogs in the shelter and 5 dogs get homes, and then 43 more dogs come. how many dogs are there in the shelter?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Find the distance between c and d on the number line c=3 and d=11
Answers: 1
You know the right answer?
A construction worker needs to pour a rectangular slab 27 ft​ long, 15 ft​ wide, and 4 in. thick. Ho...
Questions
question
Mathematics, 09.03.2021 05:40
question
Arts, 09.03.2021 05:40
Questions on the website: 13722367