subject
Mathematics, 24.03.2021 16:50 SoccerdudeDylan

A tool manufacturer tests three types of cutters used in a lathe operation. One type is a laminated steel cutter consisting of very hard high carbon steel sandwiched between two softer steels. Another is a special high speed tool steel cutter developed using powder metallurgy. The final one is made from cryogenically treated steel. Several cutters of each type are tested to see how long they will last (in hours) in continuous operation until they need to be sharpened. The times are recorded for each cutter used in the study and the results are summarized below. Assume the data are three independent simple random samples, one from each of the three populations of cutters, and the distribution of the times until sharpening is needed is normal. Is there sufficient evidence that there is a difference in the mean time until sharpening between the three cutters at the α=.05 significance level? Laminated SteelHigh-speed SteelCryogenically Treated Steel
24.9940.3645.67
27.4626.4740.78
30.6839.9528.11
33.6726.2847.88
28.2648.5438.77
40.5532.4028.77
28.1726.1136.85
31.4744.1441.80
45.1131.3550.16
45.8236.1136.18
30.9736.7730.51
21.9032.6738.76
43.0028.2837.59
49.4448.1732.95
36.6929.3732.97
37.6434.3442.17
38.0037.7629.98
29.3616.0651.76
39.0020.4120.49
45.8646.3143.57
42.6124.3437.96
42.2321.9744.20
39.6040.9845.12
37.8623.6742.25
28.7435.3638.15
35.8128.0038.45
37.0226.2741.05
41.57 40.23
30.94 39.07
37.70 26.73
33.00 41.01
18.25 35.69
36.06
31.02
40.01
22.62
36.13
16.89
34.71

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
If f(x)= 3x+6 which of the following is the inverse of f(x)
Answers: 2
question
Mathematics, 21.06.2019 19:30
Me. i can't figure out this question. give an explanation too. .
Answers: 1
question
Mathematics, 21.06.2019 20:50
What is the greatest number of parts of a circle that can be formed by cutting the circle with 7 straight cuts? (note: the parts do not have to be equal in size)
Answers: 3
question
Mathematics, 21.06.2019 21:30
He ! a group of farmers planned to clean 80 acres of wheat per day to finish the work on schedule. right before the work started, they received a new piece of machinery that them clean 10 more acres per day than originally planned. as a result of increased productivity in the last day before the deadline they only had to clean 30 acres. how many acres of wheat did the group of farmers have to clean?
Answers: 1
You know the right answer?
A tool manufacturer tests three types of cutters used in a lathe operation. One type is a laminated...
Questions
question
Mathematics, 27.07.2021 22:40
question
Mathematics, 27.07.2021 22:40
Questions on the website: 13722359