subject
Mathematics, 26.03.2021 14:00 ajayrose

Jane and Philip working together can do a piece of work in 6 days. Jane working alone takes 5 days longer than Philip. How many days does it take Philip to do the work alone?​

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Each of the four sides of a swimming pool measures 9 meters. the pool is 5 meters deep. how much water will be needed to fill it completely? a. 45 cubic meters b. 81 cubic meters c. 225 cubic meters d. 405 cubic meters reset next
Answers: 1
question
Mathematics, 21.06.2019 18:00
Asquare has a perimeter of sixteen centimeters. what is the length of each of its sides? a. 8 cm c. 9 cm b. 4 cm d. 10 cm select the best answer from the choices
Answers: 2
question
Mathematics, 22.06.2019 02:00
Emmanuel added 888 links per minute to his chain mail. allesia started 202020 minutes after emmanuel and added 131313 links per minute to her chain mail. how long had emmanuel worked when allesia caught up to him, and how many links had he added?
Answers: 1
question
Mathematics, 22.06.2019 02:00
The half-life of a certain material is 0.004 second. approximately how much of a 20-gram sample will be left after 0.016 second? a. 5 grams b. 16 grams c. 0.32 gram d. 1.25 grams
Answers: 3
You know the right answer?
Jane and Philip working together can do a piece of work in 6 days. Jane working alone takes 5 days l...
Questions
question
History, 08.03.2021 22:40
question
English, 08.03.2021 22:40
question
Biology, 08.03.2021 22:40
Questions on the website: 13722367